|
Year
|
Client
|
Major Projects
|
|---|---|---|
| 2010 | Cnooc And Shell Petrochemicals Company LTD. (cspc) | Controlled bolt tightening & in-situ machining services for cspc (china) 2010 t/a. |
| 2010 | Sarawak Shell Berhad | Cold Cutting & Beveling Services At B11 & F23 Platform, Offshore |
| 2010 | Teknik Janakuasa Sdn Bhd | Pipe Wrapping For 1 Unit Of 28″ Pipe At Teknik Janakuasa Lumut Plant Using Diamond Wrap |
| 2010 | Tanjung Maintenance Services Sdn Bhd | In-Situ Milling For 12 Nos Pump Base At Boa Platform, Offshore |
| 2010 | Bp Chemicals (M) Sdn Bhd | Controlled Bolt Tightening Services For Bp Chemicals Shutdown 2010 |
| 2010 | Shell Refining Company (Federation Of Malaya) Bhd | Pipe wrapping for slops & sour line, v-194 using diamond wrap. |
| 2010 | Carigali Hess | Cold Cutting & Beveling Services At Cakerawala Platform, Offshore |
| 2010 | Sarawak Shell Berhad | Cold Cutting Services At Sarawak Water, Offshore Platform B11 |
| 2010 | Srimultec Engineering Sdn Bhd | On-site re-surfacing for 12 nos cs drive head o.d. 2134mm (50mm thickness) for dumusut kakat hull project, mmhe. |
| 2010 | Petronas Carigali | Cold cutting and tapping services for vent to flare upgrading project @ baronia offshore, east malaysia. |
| 2010 | Titan Petchem (M) Sdn Bhd | In-situ Machining for Titan Plant TA 2010. |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Pipe Wrapping For 1 Unit Of 24″ X 24″ TEE By Using Diamond Wrap |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Pipe Wrapping For 2 Units Of 20″ Elbow For H2S Line Using Diamond Wrap |
| 2009 | Aker Solutions Malaysia Sdn Bhd | PWHT Of Connector Welds For Choke & Kill Line & Booster Line Pipes Using Induction Heating |
| 2009 | Shell Refining Company (Federation Of Malaya) Bhd | Pipe Wrapping For 10 Off 2″ Elbows, 2 Off 1-1/2″ Elbows, 2 Off 2″ X 2″ Tees & 3.3 Meter 2″ Straight Pipes Using Diamond Wrap |
| 2009 | Shell Refining Company (Federation Of Malaya) Bhd | Pipe Wrapping For 8 Off 2″ Elbow, 3 Off 2″ Elbows With Pipe Supports & 1 Off 2″ X 2″ Tees At MVU Plant Using Diamond Wrap |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Hydraulic Bolt Tensioning For C-1801 At MG3, PPMSB |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | On line leak sealing for 16″ pipe at unit 33 by using rapp-it & diamond wrap. |
| 2009 | Optimal | Hydraulic Torquing Of Total 225 Flanges At Olefin Plant, Optimal Paka |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Pipe Wrapping For Denim Regeration Vesselv-51214 |
| 2009 | KNM OGPET (East Coast) Sdn Bhd | Hole Boring To Enlarge 8 X 44 Bolt Holes Flange At KNM KPS |
| 2009 | Petronas Penapisan (Terengganu) Sdn Bhd | In-situ Flange Flatness Check & Machining For E21111A & E21111B |
| 2009 | Petronas Carigali | Flange Resurfacing & Bolt Hole Drilling For 3 NOS 2243MM OD X 1753MM ID Flange @ Dulang B Platform |
| 2009 | Color Ocean Energy Limited | Cold Cutting & Beveling of Pipe Conductor at Oil Rig, Indonesia Water |
| 2009 | Kencana Infrastructure Sdn. Bhd. | Bolt Tightening Job For MGP-1, Sarawak Gas Phase 1 Development Project |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Pipe Wrapping For 1 Off 24″ X 8″ TEE (Branch 9) and 1 Off 24″ Elbow (P6) at C-21201, Area 2 By Using Diamond Wrap |
| 2009 | Sheel Refining Copany (Federation of Malaya) Bhd | Pipe Wrapping For 10 Meters of 16″ HCO Line At Jetty By Using Cordobond Wraps |
| 2009 | Petronas Gas Berhad | To Perform On-line Leak Repair For 1 Off Heat Exchanger Leak With OD=1050MM at T4-151, GPP4. |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | On-line Leak Repair For E-39408 Heat Exchanger Channel Head Cover Leak. |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Controlled Bold Tightening For Package B1, Unit 29, 30 & 31 at PPMSB Plant |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Controlled Bolt Tightening For Package B2, Unit 33, 34, 35 & 50 at PPMSB Plant |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | Controlled Bolt Tightening at MG3 Plant at PPMSB Plant |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | In-situ Flange Facing at MG3 Plant, PPMSB TA 2009 |
| 2009 | Petronas Penapisan (Melaka) Sdn Bhd | On-site Machining Services at PPMSB TA 2009 |
| 2008 | Shell PD | 2” x 240mtr sour water pipeline rehabilitation (Pipe Wrapping Shell) |
| 2008 | Petronas Penapisan Melaka | 24” x 100mtr pipe rehabilitation (Pipe Wrapping) |
| 2008 | Perwaja Steel | 2008 T/A (Machining) |
| 2008 | Carigali HESS Operating Co. (CHOC) | Ph.2 Early Gas Brownfield Const. (Bolting & Machining) |
| 2007 | Petronas Penapisan Terengganu | PIREC & CFU 2007 S/D (Bolting & Machining) |
| 2007 | Petronas Penapisan Melaka | PSR1 2007 T/A (Bolting & Machining) |
| 2006 | Petronas Gas Bhd | GPP-3 2006 T/A (Bolting/ Machining) |
| 2006 | Vinyl Chlorides (M) SB | VCM 2006 T/A (Bolting/ Machining) |
| 2006 | Optimal Chemicals (M) S/B | Optimal 2006 T/A (Bolting/ Machining) |
| 2006 | DBNG project, Australia | Cold Cutting – 200nos 26″ CS pipe (Machining) |
| 2005 | Petrovietnam | Petro Vietnam GPP 2005 T/A (Bolting/ Machining) |
| 2005 | Woodside Energy Ltd, Australia | OTWAY Gas Project. (Machining) |
| 2005 | Petronas Penapisan Trengganu S/B | PPTSB KR1 & KR2 2005 TANP (Bolting/ Machining) |
| 2005 | Petronas Carigali S/B | Petronas Carigali OGT Feb 2005 T/A (Bolting) |
| 2005 | Petronas Fertilizer Kedah | SYNGAS compressor shutdown project (Bolting) |
| 2005 | Petronas Penapisan Melaka S/B | Bolting & Machining – Petronas Penapisan Melaka S/B @ Unit 35,32,28,25 (Bolting) |
| 2005 | Brunei Shell Petroleum | Cold cutting – Seria Tie-In Project (Machining) |
| 2003 | Mobil S’pore | Mobil S’pore 2003 T/A (Bolting) |
| 2003 | Petronas Gas Bhd | GPP-2 2003 T/A (Machining) |
| 2003 | Petronas Penapisan Melaka S/B | Flange Facing – PPMSB project (Machining) |
| 2003 | Sarawak Shell Berhad | Joint intergrity management services consist of HBT,HTW,cold cutting & beveling and flange facing for Sarawak Shell B11 HUC Project (Bolting/ Machining) |
| 2003 | Optimal | Optimal 2003 T/A (Bolting) |
| 2003 | Petronas Gas Bhd | GPP-5 2003 T/A (Bolting) |
| 2003 | Alstom | In-situ machining services for boiler feed pump mechanical seal seating area for Pump #1, Pump #2 & Pump #3 (Machining) |
| 2002 | Petronas Gas Bhd | GPP-4 2002 T/A (Machining) |
| 2002 | Petronas Carigali S/B | Cold Tapping – Duyong Platform (Hot Tapping) |
| 2002 | TNB Gelugor | TNB Gelugor -Pipe beveling for Combined Cycle Conversion Project (Machining) |
| 2002 | Petronas Gas Bhd (CUF) | Petronas CUF – Leak sealing of 10″ 2500# RTJ flange leaks (gap 175 mm) using insert clamp @ ASU 2 plant. Operating at 110 barg and 490 deg. C, HPsteam leaks. (Leak Sealing) |
| 2002 | Manjung Power Plant | Cold cutting reheater & superheater outlet pipe spools – Manjung Power Plant Unit 1 (Machining) |
| 2002 | BASF Petronas | Flange facing – BASF Plant Shutdown. (Machining) |
| 2002 | EPMI | Cold Cutting, Machining & Bolting – EPMI Tapis & Guntong ‘D’ Shutdown. (Bolting/ Machining) |
| 2002 | Ammonia (M) S/B & Petronas Penapisan Trengganu S/B | Ammonia Malaysia SB & Petronas Penapisan Trengganu KR 2 warranty shutdown. (Machining) |
| 2002 | Unocal Thailand | 16″ XS pipes cutting and bevelling @ Bredero for Unocal, Thailand. (Machining) |